LV 412 - Heating system
The heating system concerns the school building, which was built in the 70s in reinforced concrete skeleton construction
became. The other surrounding school buildings and sports facilities are not part of the measure.
LV 412 - Heizungsarbeiten
For the existing middle school, the following services are required;
1 brine / water heat pump / 86kW with accessories and well pump
3 plate heat exchangers
1 pcs buffer cylinder
2 central heating circuit distributors
12 pcs centrifugal pump as glandless circulation pump
Tubular radiators with accessories approx. 200 components
25 skirting board heating strips
Approx. 50 stainless steel distributors ceiling heating incl. zone regulation
Dismantling work Inventory
Pressure maintenance, degassing and replenishment
core drilling