Lot 08 Roofing work
Number of LV pages approx. 130 / execution period 10.10.2023 - 15.05.2024
Duration
- Approx. 200 m dismantling + disposal of lightning protection system
- Approx. 440 m demolition + disposal of roof edge finishes metal
- Approx. 320 m² dismantling, waterproofing, roof edge, bitumen, multi-layer membrane, wooden plank
- Approx. 255 m² dismantling of flat roof insulation
- Approx. 440 m new roof edge including vapour barrier, insulation, KSB, profile
- Approx. 37 m new attic including vapour barrier, insulation, KSB, cover
- Approx. 20 pcs. renovation/new roof penetrations (fan + drains)
- Ca. 200 m überfahrbares Absturzsicherungssystem
- Approx. 1,340 m² 1-layer revision of the roof waterproofing
new
- Approx. 300 m² cross-laminated timber ceiling REI 30 from below, multipurpose room in courtyard 1
- Approx. 300 m² FPO roof waterproofing incl. wall connections + connection to skylight strip
- Approx. 10 new roof penetrations (fans, drains, ventilation ducts)
- Approx. 1 piece skylight strip incl. frame + maintenance
- Approx. 20 m² FPO roof waterproofing entrance structure (vestibule)
- Approx. 20 m roof edge end + box gutter & downpipe