Reorganization and renovation of the cooperative comprehensive school Leeste, Schulstr. 40, 28844 Weyhe. The existing school building is a two-storey flat roof construction in reinforced concrete and masonry construction from 1973/74 with a gross floor area of approx. 14,000 m
Radiators and accessories, pipes and fittings,
Pipeline insulation, dismantling and assembly work, other for all construction stages.
ventilationVentilation equipment and accessories, ventilation ducts and accessories, air outlets and accessories, air duct insulation, dismantling and assembly work, other, for all construction phases.
SanitaryDrainage pipes and accessories, drinking water pipes and accessories,
Fittings and accessories, pipe insulation and fire protection, sanitary objects and accessories, dismantling and assembly work, other, for all construction phases.