Volume of work: Excavated: 18,575 m3; Evacuation: 24,250 m3; Excavations: 5,815 m3; Input materials: 20,785 m3; Extraction of the trunk for recycling: 14,000 m3; Cold bituminous emulsion treatment: 14,000 m3; Asphalt: 9,160 TB; Milling of pavement: 24,700 m2; Borders: 3,155 m; Line of cobblestones: 4,930 m; Concrete pavers: 4,900 m2; Sheet piling: 3,560 m2; Trench armour: 22,820 m2; Discharge pipe: 2,015 m
Volume of work: Excavated: 18,575 m3; Evacuation: 24,250 m3; Excavations: 5,815 m3; Input materials: 20,785 m3; Extraction of the trunk for recycling: 14,000 m3; Cold bituminous emulsion treatment: 14,000 m3; Asphalt: 9,160 TB; Milling of pavement: 24,700 m2; Borders: 3,155 m; Line of cobblestones: 4,930 m; Concrete pavers: 4,900 m2; Sheet piling: 3,560 m2; Trench armour: 22,820 m2; Discharge pipe: 2,015 m