Supply of 90 kV cables + accessories (junctions, ends...) for the construction of a new 63 kV underground power line Algiers Debonaire.
Segment 1 (approx. 3.5 km): from Débonnaire post to Blory sector with passage through a cycle bridge under constructionSegment 1 (approx. 3.5 km): from Débonnaire post to Blory sector with passage through a cycle bridge under operation.
Segment 2 (approx. 3.5 km): from Algiers post to Blory sector with passage through a directional drilling under pavementSegment 2 (approximately 3.5 km): from Algiers post to Blory area with passage through a directional drilling under pavement.