Tender for construction team for the installation of charging infrastructure 1. Strategic partner for electrical installation
a. Implementation of a Power Management System for Electric Vehicles (maximizing the use of available grid connection(s))
Management of Power Management System
b. Advisory for electrical/energy issues
2. Charging stations
a. Installation of 1x400 kW DC Charging Infrastructure Compact Station
b. DC Charging Infrastructure: phased installation of 1x 350 kW and approximately 7x 160 kW DC charging points
3. The EMS system must initially be suitable for future expansions.
a. The current charging stations must be connected to the new EMS system.
LOT-0000
1
Lot 1 - Construction team Charging Infrastructure.
1. Strategic partner for electrical installation
a. Implementation of a Power Management System for Electric Vehicles (maximizing the use of available grid connection(s))
Management of Power Management System
b. Advisory for electrical/energy issues
2. Charging stations
a. Installation of 1x400 kW DC Charging Infrastructure Compact Station
b. DC Charging Infrastructure: phased installation of 1x 350 kW and approximately 7x 160 kW DC charging points
3. The EMS system must initially be suitable for future expansions.
a. The current charging stations must be connected to the new EMS system.