A. The services subject to the procurement contract are:
- Preparation of the technical project (PTh);
- Preparation of the execution organization project (P.O.E.)
- Preparation of execution details (DDE);
- Technical assistance from the designer during the execution of the works.
The above services will be in accordance with Government Decision no. 907/2016 regarding the stages of preparation and the framework content of the technical-economic documentation related to the investment objectives/projects financed from public funds with subsequent amendments and completions.
Attention: for LOT 2 - Regarding the coexistence study specified in the agreement from CNAIR (related to the BRIDGE), it is the responsibility of the designer to carry it out.
B. The execution works covered by the contract: the works consist of construction and modernization of road infrastructure.
All works are detailed in detail within DALI/DTAC and the annexes attached to the specifications. The provisions of DTAC/DALI and the annexes attached to the specifications are considered integral parts of the specifications - these parts contain technical specifications that represent requirements, prescriptions, technical characteristics that allow services and works to be described objectively, so as to meet the needs of the contracting authority, requirements based on which the conformity of the technical offer is established and the application of the general clauses 19 from the contract model approved by Annex 2, HG no. 1/2018, with subsequent changes. Present also the design theme.
Economic operators may request clarifications/additional information regarding the attribution documentation up to 20 days before the deadline for submission of offers so that the response of the contracting authority will be transmitted 11 days before the deadline for submission of offers.
LOT-0001
Design and execution of works for the objective: Urban Mobility Corridor between Sângeorz-Băi and the locality of Cormaia, in the city of Sângeorz-Băi.
A. The services subject to the procurement contract are:
- Preparation of the technical project (PTh);
- Preparation of the execution organization project (P.O.E.)
- Preparation of execution details (DDE);
- Technical assistance from the designer during the execution of the works.
The above services will be in accordance with Government Decision no. 907/2016 regarding the stages of preparation and the framework content of the technical-economic documentation related to the investment objectives/projects financed from public funds with subsequent amendments and completions.
B. The execution works covered by the contract: the works consist of construction and modernization of road infrastructure.
All works are detailed in detail within DALI/DTAC and the annexes attached to the specifications. All works are detailed in detail within DALI/DTAC and the annexes attached to the specifications. The provisions of DTAC/DALI and the annexes attached to the specifications are considered integral parts of the specifications - these parts contain technical specifications that represent requirements, prescriptions, technical characteristics that allow services and works to be described objectively, so as to meet the needs of the contracting authority, requirements based on which the conformity of the technical offer is established and the application of the general clauses 19 from the contract model approved by Annex 2, HG no. 1/2018, with subsequent changes. Present also the design theme.
ATTENTION: As can be seen from the estimated value, the investment also includes the bidding for line 4.5 facilities which consists of:
- lot 1 – Design and execution of works for the objective: Urban Mobility Corridor between Sângeorz-Băi and the locality of Cormaia, in the city of Sângeorz-Băi
1. Flexible guiding poles 203 pieces
2. Public transport station – 9 pieces
Bidders will consider offering these strictly for those indicated above. For other types of machinery and facilities within DALI/DTAC, we mention that:
- Will not be offered
- They are found in the technical documentation only for the proper information of the bidders.
LOT-0002
Design and execution of works for the objectives: CONSTRUCTION OF A BRIDGE OVER THE SOMEȘUL MARE RIVER and INCREASING URBAN MOBILITY IN THE LUNCA MARE AREA – VALEA SOMEȘULUI, IN THE CITY OF SÂNGEORZ-BĂI – INVESTMENT OBJECTIVE “MODERNIZATION OF RURAL ROADS IN THE CITY OF SÂNGEORZ-BĂI”.
A. The services subject to the procurement contract are:
- Preparation of the technical project (PTh);
- Preparation of the execution organization project (P.O.E.)
- Preparation of execution details (DDE);
- Technical assistance from the designer during the execution of the works.
The above services will be in accordance with Government Decision no. 907/2016 regarding the stages of preparation and the framework content of the technical-economic documentation related to the investment objectives/projects financed from public funds with subsequent amendments and completions.
Attention: for LOT 2 - Regarding the coexistence study specified in the agreement from CNAIR (related to the BRIDGE), it is the responsibility of the designer to carry it out.
B. The execution works covered by the contract: the works consist of construction and modernization of road infrastructure.
All works are detailed in detail within DALI/DTAC and the annexes attached to the specifications. All works are detailed in detail within DALI/DTAC and the annexes attached to the specifications. The provisions of DTAC/DALI and the annexes attached to the specifications are considered integral parts of the specifications - these parts contain technical specifications that represent requirements, prescriptions, technical characteristics that allow services and works to be described objectively, so as to meet the needs of the contracting authority, requirements based on which the conformity of the technical offer is established and the application of the general clauses 19 from the contract model approved by Annex 2, HG no. 1/2018, with subsequent changes. Present also the design theme.
As can be seen from the estimated value, the investment also includes the bidding for line 4.5 facilities which consists of:
- lot 2 – Design and execution of works for the objectives: CONSTRUCTION OF A BRIDGE OVER THE SOMEȘUL MARE RIVER and INCREASING URBAN MOBILITY IN THE LUNCA MARE AREA – VALEA SOMEȘULUI, IN THE CITY OF SÂNGEORZ-BĂI – INVESTMENT OBJECTIVE “MODERNIZATION OF RURAL ROADS IN THE CITY OF SÂNGEORZ-BĂI”
1. Public transport station – 2 pieces
Bidders will consider offering these strictly for those indicated above. For other types of machinery and facilities within DALI/DTAC, we mention that:
- Will not be offered
- They are found in the technical documentation only for the proper information of the bidders.