1. The subject of the contract is construction work consisting of the reconstruction of the bicycle path (to asphalt) in Białystok along: Baranowicka Street from the intersection of K. Ciołkowski Street with Baranowicka Street to the connection with the existing asphalt bicycle path near building no. 195. 2. The scope of the order includes: 1) reconstruction of the bicycle path, 2) reconstruction of the pedestrian path, 3) overhead low-voltage electricity network 0.4 kV with a pole, 4) underground electricity network, 5) earthworks and demolition, 6) regulation of the armature on the existing utilities, 7) construction of connections and stormwater inlets, 8) planting of trees and shrubs, 9) relocation of the marker poles for water and gas pipelines, 10) installation of shelters, 11) vertical and horizontal signage, 12) installation of 2 one-sided informational and commemorative boards. 3. The planned task is to be implemented as part of the project entitled: “Improvement of urban mobility (bicycle and bus) in the Białystok Functional Area.”
LOT-0001
ZDM- XIV.271.48.2025
Reconstruction of the bicycle path (to asphalt) in Białystok along: Baranowicka Street from the intersection of K. Ciołkowski Street with Baranowicka Street to the connection with the existing asphalt bicycle path near building no. 195.
1. The subject of the contract is construction work consisting of the reconstruction of the bicycle path (to asphalt) in Białystok along: Baranowicka Street from the intersection of K. Ciołkowski Street with Baranowicka Street to the connection with the existing asphalt bicycle path near building no. 195. 2. The scope of the order includes: 1) reconstruction of the bicycle path, 2) reconstruction of the pedestrian path, 3) overhead low-voltage electricity network 0.4 kV with a pole, 4) underground electricity network, 5) earthworks and demolition, 6) regulation of the armature on the existing utilities, 7) construction of connections and stormwater inlets, 8) planting of trees and shrubs, 9) relocation of the marker poles for water and gas pipelines, 10) installation of shelters, 11) vertical and horizontal signage, 12) installation of 2 one-sided informational and commemorative boards. 3. The planned task is to be implemented as part of the project entitled: “Improvement of urban mobility (bicycle and bus) in the Białystok Functional Area.”