Construction of Network Connections for E-Mobility at Rest Areas of A12 and A13 - Construction of a Transformer and MSP Building/ MSP Cabling/ Electrotechnical Equipment of the Building | Tenderlake

Construction of Network Connections for E-Mobility at Rest Areas of A12 and A13 - Construction of a Transformer and MSP Building/ MSP Cabling/ Electrotechnical Equipment of the Building

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 October 2025
Closing Date:
14 October 2025
Location(s):
AT334 Tiroler Oberland (AT Austria/ÖSTERREICH)
Description:
Establishment of charging infrastructure for electric mobility at six rest areas along A12 and A13, including the construction of a transformer, medium voltage cells, and necessary electrotechnical equipment.

Establishment of charging infrastructure for E-Mob at 6 rest areas (A12 and A13). Construction/manufacturing of an E-mob row, installation of provided transformers and medium voltage cells. Electrotechnical equipment of the E-mob row. Cabling (MSP) and commissioning of the systems. Installation of charging stations is not part of the advertised service.


LOT-8365
Construction of Network Connections for E-Mobility at Rest Areas of A12 and A13 - Construction of a Transformer and MSP Building/ MSP Cabling/ Electrotechnical Equipment of the Building.
Establishment of charging infrastructure for E-Mob at 6 rest areas (A12 and A13). Construction/manufacturing of an E-mob row, installation of provided transformers and medium voltage cells. Electrotechnical equipment of the E-mob row. Cabling (MSP) and commissioning of the systems. Installation of charging stations is not part of the advertised service.

The Buyer:
Autobahnen- und Schnellstraßen- Finanzierungs-Aktiengesellschaft
Additional information:
Link:
View Full Notice
Link:
Additional document: 159767/224019/96
Link:
Download Full Notice as PDF
CPV Code(s):
45000000 - Construction work