Opportunity for the installation and maintenance of approximately 1,692 Electric Vehicle Charging Stations at Sizewell C, including immediate installation of 259 active chargers and subsequent installation of passive chargers.
Sizewell C has an opportunity for the installation & maintenance of Electric Vehicle (EV) Charging Stations to be positioned at the Main Construction Area, Ancillary Construction area, Temporary Construction Area and North & South Car Parks. The total quantity will be approximately 1,692, this includes 259 active charging stations to be installed immediately followed by a maximum of 1,433 of passive EV chargers. Design has been pre-determined and will be shared later in the tender process. The scope will require regular maintenance to be carried out and faults repaired promptly, furthermore the capacity of EV chargers should be monitored to ensure maximum efficiency.
SZC requires EV charging stations with a minimum of 3.6kW power output which would be sufficient for staff and visitors to charge their car during the average work day.
CPV Code(s):
31610000 - Electrical equipment for engines and vehicles
Stay Updated
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.