The subject of the contract is to carry out construction works for the construction object "SO 01 Rough Groundworks (HTÚ) – 2B Stage and Geotechnical Monitoring". Preparation of the area so that the future construction site is ready for the end client with the following boundary conditions preserved:
a) working area at the level: - 0.600 = 215.400 m above sea level, (±0.000 = 216.000 m above sea level),
b) required deformation modulus: Edef = 80MPa simultaneously Edef2 / Edef1 less than 2.5. Detailed information is part of Volume 3 Description of the subject of the contract of these competition documents.
LOT-0001
Rough Groundworks for the Industrial Park in Rimavská Sobota_2B Stage and Geotechnical Monitoring.
The subject of the contract is to carry out construction works for the construction object "SO 01 Rough Groundworks (HTÚ) – 2B Stage and Geotechnical Monitoring". Preparation of the area so that the future construction site is ready for the end client with the following boundary conditions preserved:
a) working area at the level: - 0.600 = 215.400 m above sea level, (±0.000 = 216.000 m above sea level),
b) required deformation modulus: Edef = 80MPa simultaneously Edef2 / Edef1 less than 2.5. Detailed information is part of Volume 3 Description of the subject of the contract of the competition documents.