The framework agreement with a maximum is made in application of articles L. 2125-1 1°, R. 2162-1 to R. 2162-6, R. 2162-13 and R. 2162-14 of the Public Procurement Code. It will lead to the issuance of order forms.
The execution time for each service is set by each of the order forms. It will be set by the project owner, but the holder of the framework agreement may give their opinion on it.
The maximum intervention and execution time may be set by the project owner to 48 hours for certain services (control of trench compaction or surface compaction, for example).
The estimated value indicated corresponds to the maximum duration (4 years)
LOT-0001
1
Laboratory or in situ studies and inspections necessary for the construction and maintenance of roads.
Laboratory or in situ studies and inspections necessary for the construction and maintenance of roads
LOT-0002
2
Geotechnical studies necessary for the construction and maintenance of roadworks and buildings.
Geotechnical studies necessary for the construction and maintenance of roadworks and buildings
LOT-0003
3
Inspections and tests on structural concrete.
Inspections and tests on structural concrete