A9_km 184+803.9-189+862.8 & A4_km 151+488.4-155+216.6, AK_Hermsdorf_bFR_ERW - Planning Accompanying Surveying Including Mobile Laser Scanning Lot 1: southern axis A4 (A1029400131) Lot 2: northern axis A4 (A1029400132)
LOT-0001
A9, Direction Munich, A4, Direction Dresden.
The Federal Motorway Company intends to carry out planning accompanying surveying and prepare current planning documentation for the reconstruction and expansion of the Hermsdorf interchange. The project area of the surveying services extends over the following motorway sections. -A4, km 151+488.4 to 155+216.6, both directions of the carriageway - A9, km 184+803.9 to 189+862.8, both directions of the carriageway The following approximate quantities can be made: Lot 1: - Contrary to the project title, the surveying section "Mobile Laser Scanning" extends over approximately 6.7 km in the area of BAB A4west and A9 - Establishment of control points for mobile laser scanning - Tacheometric supplementary measurements on the motorways and further on both sides up to the lot boundary - Recording of 2 parking spaces, 1 connection point on both sides, 1 PWC facility - Detailed survey of 4 bridge structures - Determination of position and height of control points in the required reference system - Evaluation of existing data (producing point cloud and digital existing data) - Calculation of DGM - Application for and obtaining VAO - Traffic safety for workplaces of shorter duration (erecting, maintaining, waiting, repairing, operating, and dismantling according to RSA 21 and ZTV-SA)
LOT-0002
A9, Direction Berlin, A4, Direction Göttingen.
The Federal Motorway Company intends to carry out planning accompanying surveying and prepare current planning documentation for the reconstruction and expansion of the Hermsdorf interchange. The project area of the surveying services extends over the following motorway sections. -A4, km 151+488.4 to 155+216.6, both directions of the carriageway - A9, km 184+803.9 to 189+862.8, both directions of the carriageway The following approximate quantities can be made: Lot 2: - Contrary to the project title, the surveying section "Mobile Laser Scanning" extends over approximately 6.7 km in the area of BAB A4west and A9 - Establishment of control points for mobile laser scanning - Tacheometric supplementary measurements on the motorways and further on both sides up to the lot boundary - Recording of 2 parking spaces, 1 connection point on both sides, 1 PWC facility - Detailed survey of 4 bridge structures - Determination of position and height of control points in the required reference system - Evaluation of existing data (producing point cloud and digital existing data) - Calculation of DGM - Application for and obtaining VAO - Traffic safety for workplaces of shorter duration (erecting, maintaining, waiting, repairing, operating, and dismantling according to RSA 21 and ZTV-SA)