Groundwater pollution monitoring or control services | Tenderlake

Groundwater pollution monitoring or control services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
18 December 2023
Closing Date:
24 January 2024
Location(s):
CZ042 Ústecký kraj (CZ Czech Republic/ČESKÁ REPUBLIKA)
Description:
Elaboration of an updated risk analysis with extensive exploratory work to verify the current extent of contamination of groundwater and analyze the risks for human health and ecosystems, including mapping the rock environment, monitoring groundwater parameters, and evaluating the survey through a final report for the Czech Environmental Inspectorate.
"Updated risk analysis on the premises of Z-Group a.s., Chomutov plant"

The subject of the performance is the elaboration of an updated risk analysis with extensive exploratory work in order to verify the current extent of contamination of the unsaturated and saturated zone and subsequently to analyze the risks arising from them for human health and ecosystems.

The main objectives of the exploration work are as follows:

• detailed mapping of the rock environment, thickness, composition and contamination of anthropogenic landfills, Quaternary sediments, or underlying rocks

• Construction of facilities for monitoring qualitative and quantitative parameters of shallow Quaternary aquifers (Quaternary sediments or anthropogenic backfills)

• Verification of underlying rocks and possible contamination of the upper parts of the underlying rocks

• Verification of the level and quality of groundwater, including relevant verification of hydraulic parameters of the rock environment

• Exploration objects are designed in such a way that it is possible to realistically assess ClU pollution in the saturated zone

• Complement the data on groundwater flow, while the data will also be used for a mathematical model of groundwater flow

• To monitor the quality of surface water and sediments

• Perform flow measurements

The additional survey will be evaluated by the final report, on the basis of which a mathematical model and an Update of the risk analysis will be processed.

Part of the subject-matter of performance is the elaboration of the implementation project, which must not change the subject-matter of performance defined by the project documentation, which is Annex No. 3 to the Act, but will specify and specify it with regard to the method of execution of the contract by the contractor. The implementation project will specify, among other things, preparatory work, drilling work, hydrodynamic tests, sampling work, geodetic work, laboratory work. After its approval, the prepared AAR will serve as a basis for the eventual issuance of a decision by the Czech Environmental Inspectorate, based on an application submitted by the acquirer.

Download full details as .pdf
The Buyer:
Ministerstvo financí
CPV Code(s):
90732400 - Soil pollution advisory services
90732600 - Soil pollution measurement or monitoring
90733700 - Groundwater pollution monitoring or control services