New Meiningen service workshop - floor coating
The Erfurter Bahn GmbH awards i. A. Süd-Thüringen-Bahn GmbH Construction work for the construction of a new service workshop in Meiningen; Building plot Berliner Str. 2a. Here floor coating work.
- approx. 60 m 2nd Coat the oil pipe duct (bottom and side surfaces) with 2-component EP gradient coating in accordance with WHG § 62;
- approx. 1 468 m 2nd Coat floor surfaces with fillable, pigmented, low-emission EP-based leveling coating, for industrial floors with medium to heavy loads, slip resistance class R 11;
- approx. 61 m 2nd Floor surfaces are coated with low-emission litter coating on EP basis with a non-slip surface, for mechanically medium to heavily loaded industrial floors, slip resistance class R 11 V 4.