Junge Barley ApS hereby invites to make offers for the establishment of 50 youth residences, 25 family homes, executed in 4 floors with partial basement.
The construction includes the construction of approximately 4200 m2 of residential housing in 4 floors, spread out of 50 youth dwellings and 25 family dwellings. A partial basement is established under the built-in gene and construction is included terrain works. Basement amounts to about 300 m2 and contains depots and engineering.
5 firms shall be pre-qualified for tenders at each of the following entry rates:
1. Soil, Sewer & Coating
2. Concrete works
3. Concrete elements, delivery and assembly
4. Bathing cabin delivery
5. Steel
6. Pplumbing worker
7. Power Worker
8. Ventilation works
9. Brickworks
10. Roofing worker
11. Painting worker
12. Lift
13. Pings, delivery and assembly
14. Floor structure (EPS concrete + wear layer)
The offering is available at RIB, with the following construction web No. TN740433A
Soil, Sewer & CoatingLand, sewer and occupancy works related to the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
The work is Incl. land handling, excl. land deposit
Roofing workerRoofing works related to the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
Including sedum and skylights
paint WorksPainting works related to the establishment of 50 youth homes, 25 family dwellings, carried out in 4 floors with partial basement.
LiftDelivery and assembly of elevator in connection with the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
Piles. Delivery and assemblyDelivery and assembly of poles in connection with the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
Floor build-upDelivery and assembly of Floor building, in the form of EPS concrete and overconcrete, in connection with the establishment of 50 youth homes, 25 family homes, carried out in 4 floors with partial basement.
Concrete worksConcrete works related to the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
Concrete elements, delivery and assemblyConcrete elements, delivery and assembly with the establishment of 50 youth residences, 25 family dwellings, executed in 4 floors with partial basement.
This includes the following deliveries:
Piles
Concrete walls, indv. walls and facade walls
Stern elements
Cover elements (incl. drainage drilling)
Ballogs
Stairs and guarding
Assembly of bath cubicles
Service lift per up/apartment
Mounting of steel composite beams
Bath cubicles, deliveryDelivery of bath cubicles in connection with the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
SteelSteelworkers associated with the establishment of 50 youth housing, 25 family dwellings, carried out in 4 floors with partial basement.
Plumbing worksPlumbing works in connection with the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
Power WorkerPlumbing works in connection with the establishment of 50 youth residences, 25 family dwellings, carried out in 4 floors with partial basement.
Ventilation worksVentilation works in connection with the establishment of 50 youth residences, 25 family dwellings, done in 4 floors with partial basement.
BricklayersMurer-works in connection with the establishment of 50 youth residences, 25 family dwellings, done in 4 floors with partial basement.