Restructuring work at the Maryse Bastié college in Dole. Completion time for all the lots: 34 months, preparation period of two months not included in this time. Completion time for each lot: two months.
AsbestosAsbestos removal.
Screeds - tiles - earthenwareScreeds - tiles - earthenware.
Flexible floor coveringsFlexible floor coverings.
Plastering - paintingPlastering - painting.
Heating - ventilation - plumbingHeating - ventilation - plumbing.
ElectricityElectricity.
liftsElevators.
CookedCooked.
Green spacesGreen spaces (lot reserved for integration structures - see article 2.4 of the consultation regulations).
Earthworks - VRDEarthworks - VRD.
Structural work - demolitionStructural work - demolition.
Wood structure - claddingWood structure - cladding.
sealingSeal.
Roofing - cladding - aluminumRoofing - cladding - aluminum.
LocksmithLocksmith.
Wood-aluminum exterior joineryWood-aluminum exterior joinery
Interior joineryInterior joinery.