Rennebu municipality shall construct a new health centre. The existing health centre shall be demolished and a new modern centre shall be constructed. Housing sections connected to the health centre shall not be demolished but adapted to a foundation.
A tender contest shall now be implemented where the objective is to enter into a contract with a complete engineering design group for the detailed engineering design services, which shall form the basis for general contracting.
The total scope is as follows:
Demolition: 3 233 m
New building: 4 375 m
Alteration: 580 m
Rennebu municipality shall construct a new health centre. The existing health centre shall be demolished and a new modern centre shall be constructed. Housing sections connected to the health centre shall not be demolished but adapted to a foundation.
A tender contest shall now be implemented where the objective is to enter into a contract with a complete engineering design group for the detailed engineering design services, which shall form the basis for general contracting.
The total scope is as follows:
Demolition: 3 233 m
New building: 4 375 m
Alteration: 580 m