The building consists predominantly of wood (cross-laminated timber, in some areas in visible quality) and also of concrete, also in visible quality in some areas. Due to the hillside situation, the building has a partial basement. The foundation of the hall, which has no basement, is stepped from the basement level.
The basement serves school purposes (lessons, after-school care) and also consists of exposed concrete walls and interior walls in cross-laminated timber construction.
The parts that come into contact with the earth must be properly insulated and provided with perimeter insulation.
The wall between the staircase and the non-basement part of the sports hall is designed as a white bathtub.
The content of this statement of work is:
Roof waterproofing work, roof drainage, lightning protection, plumbing, roof windows, roof protection, access ladders, sealing plinth areas with liquid plastic.
Key data:
Green roof area: approx. 580 m²
Foil roof area: approx. 503 m²
The building consists predominantly of wood (cross-laminated timber, in some areas in visible quality) and also of concrete, also in visible quality in some areas. Due to the hillside situation, the building has a partial basement. The foundation of the hall, which has no basement, is stepped from the basement level.
The basement is used for school purposes (teaching, day care) and also consists of exposed concrete walls and interior walls in cross-laminated timber construction
The parts that come into contact with the earth must be properly insulated and provided with perimeter insulation.
The wall between the staircase and the non-basement part of the sports hall is designed as a white bathtub.
The content of this statement of work is:
Roof waterproofing work, roof drainage, lightning protection, plumbing, roof windows, roof protection, access ladders, sealing plinth areas with liquid plastic.
Key data:
Green roof area: approx. 580 m²
Foil roof area: approx. 503 m²