The overall project involves the renovation and extension of a three-field sports hall. The renovation concerns the roof surfaces, the façade surfaces and the interior fittings. In the course of the expansion, a single-storey extension will be built on the east side. On the south side, after the demolition of the old building, a new foyer area is being built for the main development of the three-field sports hall. The technical renovation concerns the heating, ventilation and sanitary facilities as well as the entire electrical engineering.
155 m Temporary, foldable and self-supporting side protection
1 inclined elevator for material and debris transport
1450 m² Pick up gravel fill, approx. 10 cm thick
1 pcs. test renovation
2 black areas each 750 m²
2 Mobile 4-chamber personnel airlock
33 pcs. dismantling skylights, 2.65 x 1.70 m
20 to. approx. Transport and disposal of building materials containing asbestos (>0.1%)
240 to. approx. transport and disposal of floor Z1.1