rehabilitation works of the East Tunnel in sanitary facilities in Paris 16th as part of the Eiffel Tower Site operation (3 lots)
Cover and waterproofingRoofing and waterproofing: historic roof and domes. This lot is the subject of a "technical breakdown" broken down as follows:Lot 01a: Sealing; Lot 01b: Repair of the domes
Heritage Resurfacing RehabilitationHeritage Resurfacing Rehabilitation
all trades excluding patrimonial interventionThe prescribed work is subject to a technical division:- lot 3.0: structural work - cleaning,- lot 3.1: metalwork,- lot 3.2: interior joinery - layout,- lot 3.3: painting - wall coverings,- lot 3.4: plumbing,- lot 3.5: electricity