The orthopaedic building complex built at the beginning of the 30s in Semmelweis-/Philipp-Rosenthal-Straße, which has already been renovated and converted several times, for the last time as a psychiatry, is again in need of renovation. A core task is the complete replacement of the ailing drinking water system, including connection to the public utilities, as well as the upgrading of the low-voltage grid, especially in the telecommunications sector. In addition, there are mandatory interventions in the main building distribution to ensure operation.
In the course of the construction project "Renovation with renewal of drinking water network / upgrading of wet cells and floor coverings", individual areas of use (ward kitchens, staff lounges, work rooms in/unclean) will be equipped with additional cooling.
The work will take place in individual construction phases and while adjacent hospital operations are ongoing.
1 pcs chiller air-cooled in indoor installation
1 pcs heat exchanger
2 pcs refrigerant circuits with pumps and control group
19 units of circulating air cooling units, of which 3 units with 2-stage filtration according to VDI 6022
970 m stainless steel pipeline with insulation
Commissioning with partial performance assessments