this phase consists mainly of the refurbishment of the site's centralized positive and negative refrigeration production, and the refurbishment of certain secondary installations. The Operation consists of 3 lots; the other 2 were awarded during the previous consultation.
This contract includes a mandatory PSE: more powerful CTPA refrigeration unit: power reserve for future extensions
Heating, ventilation, air conditioning