1. PART of the subject matter of the contract - Modernization of the control system and automation of the Small Hydroelectric Power Plant Veľké Kozmálovce - is the restoration of reliability of the control and information system, automation, and protections of the hydroelectric power plant Veľké Kozmálovce (hereinafter referred to as “MVE”), improvement of the reliability of unmanned operation and remote control of MVE. The implementation will involve the reconstruction of the electrical part of turbine generator 1, turbine generator 2, turbine generator 3 (hereinafter referred to as “TG1”, “TG2”, “TG3”), replacement of existing switchboards AWA, replacement of the control and information system (hereinafter referred to as “RIS”), replacement of existing switchboards, assembly, and commissioning. “1st part,” 2. PART of the subject matter of the contract - Modification of the protections of the Small Hydroelectric Power Plant Veľké Kozmálovce - is to maintain the technical safety of the equipment and the safety of employees by restoring the designed reliability of the protections. New digital protections will ensure the required selectivity, sensitivity, and speed of action with the possibility of remote management of protections, allowing the extension of inspection and testing intervals and contributing to faster fault identification and shorter downtime. “2nd part.”
LOT-0001
Modernization of the control system and automation of the Small Hydroelectric Power Plant Veľké Kozmálovce.
1. PART of the subject matter of the contract - Modernization of the control system and automation of the Small Hydroelectric Power Plant Veľké Kozmálovce - is the restoration of reliability of the control and information system, automation, and protections of the hydroelectric power plant Veľké Kozmálovce (hereinafter referred to as “MVE”), improvement of the reliability of unmanned operation and remote control of MVE. The implementation will involve the reconstruction of the electrical part of turbine generator 1, turbine generator 2, turbine generator 3 (hereinafter referred to as “TG1”, “TG2”, “TG3”), replacement of existing switchboards AWA, replacement of the control and information system (hereinafter referred to as “RIS”), replacement of existing switchboards, assembly, and commissioning.
LOT-0002
MODIFICATION OF PROTECTIONS OF THE SMALL HYDROELECTRIC POWER PLANT VEĽKÉ KOZMÁLOVCE .
The subject of this part is to maintain the technical safety of the equipment and the safety of employees by restoring the designed reliability of the protections. New digital protections will ensure the required selectivity, sensitivity, and speed of action with the possibility of remote management of protections, allowing the extension of inspection and testing intervals and contributing to faster fault identification and shorter downtime.