BW 1.220: General renovation of the bridge to transfer the B4R over the Wöhrder See with road construction work.
General renovation of the Dr. Gustav Heinemann Bridge in the landscape protection area of upper Wöhrder See.
Scope of services:
- renewal of bridge drainage 400 m;
- Temporary fill 1 000 m
- reinforced concrete work 800 m
- Shotcrete work 60 m
- Sealing work 5 100 m
- Demolition of reinforced concrete 600 m
- Repair with 2,000 m HDWS
- Manufacture connecting reinforcement 10,000 pieces;
- Road works 4800 m2