Part 1 - Road construction: Autumn, Ustronna, Stawowa, Kościelna, Chabrowa, Konwaliowa, Groszkowa - design and perform construction work
Part 2 - Construction of the road: Radzionkowska - do construction work
Part 3 - Construction of the road: Quiet - do construction work
Part 4 - Building a road: Darwin - do construction work
Part 5 - Construction of the road: Clear - do construction work
Part 6 - Construction of the road: Bachelor - do construction work
Road construction: Autumn, Ustronna, Stawowa, Kościelna, Chabrowa, Konwaliowa, Groszkowa - design and do construction work1. Measurement robots.
2. Cutting with bitumen pavement saw.
3. Demolition of curbs, concrete footings.
4. Milling of bituminous pavement.
5. Production of asphalt concrete pavement in an abrasive layer - approx. 1950 m2.
6. Production of asphalt concrete pavement in a binding layer - approx. 1900 m2.
7. Purification of bituminous pavements - approx. 1950 m2.
8. Sprinkling of pavement with asphalt - approx. 1950 m2.
9. Disassemble pavement of concrete cube.
10. Exportation of materials from demolition and their disposal.
11. Installation of curtain and protective pipes.
12. Earthworks - approx. 1700 m3.
13. The manufacture of podsypka, showers and sand backfill.
14. Complete rainwater drainage min. Ø 315 mm from PVC type/class pipes - approx. 500 mb.
15. Complete rain drainage min. Ø 160 mm from PVC type/class pipes - approx. 380 mb.
16. Complete sewer wells type/concrete class min. Ø 1200 mm - 19 set
17. Complete sewer wells type/class PP min. Ø 425 mm - 20 set
18. Complete rain grooves min. Ø 500 mm - 23 set
19. Trials, tests, measurements, inspection of channels with a TV camera.
20. Trough - approx. 10700 m2.
21. Substructure - approx. 10700 m2.
22. Concrete curbs with concrete benches - approx. 2400 mb.
23. Concrete edges on cement-sand subsypka - approx. 1400 mb.
24. Pavement made of graphite concrete cube without phase 8 cm - approx. 4500 m2.
25. Red concrete cube paveless gr. 8 cm - approx. 750 m2.
26. Paving made of gray concrete cube without phase 8 cm - approx. 2100 m2.
27. Felling of trees and shrubs - approx. 120 set
28. Humusation, grass sowing, care - approx. 3500 m2
29. Expansion of the street lighting network — in the mode design and perform construction works - execution of the installation of earth wiring, excavation, laying of wiring and accompanying works, installation works — 400 mb, completion of complete illumination poles and installation of lighting fixtures external LED type — set 15.
30. Construction and construction of the memorial plaque, 2 pcs.
Repeated works - construction works: dismantling works, demolition works, preparatory works, felling of trees with grubbing, earthworks, underconstruction, execution of a trough with substrate preparation, asphalt works, production of roadway pavement made of asphaltobetone and cubes concrete, finishing works, accompanying, surfacing, construction of vertical marking, implementation of temporary traffic organization, adjustment of equipment, recreation and cleaning works, construction of rainwater drains together with network armaments and canals, installation of wells and grooves, installation curbs and edges, execution of pavement, paved roadsides, descents, construction of street lighting.- value 1 115 688,46 zł excluding VAT.
Wadium — 70 000,00 PLN.
Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including those with disabilities and, taking into account these requirements, shall draw up a description of the subject of the order - full description includes SWZ.
The Contracting Authority pursuant to Articles 438 and 95 (1) and (2) of the Act requires employment on the basis of an employment contract by the Contractor or subcontractor of persons carrying out the activities indicated below during the execution of the contract - full description shall include SWZ.
Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. Where materials, devices, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer -full description of SWZ.
Road construction: Radzionkowska - do construction work1. Construction of a complete rainwater drainage network, approx. 1209 mb,
2. Carriageway pavement with substructure — asphaltobetone pavement, binding layer approx. 7271 m2,
3. Carriageway pavement with substructure — asphaltobetone pavement, abrasive layer approx. 7271 m2,
4. Construction of paved sides of concrete cube (including descents) - approx. 1819 m2,
5. Construction of walking — bicycle (including descents) — asphaltobetone pavement — approx. 4094 m2,
6. Construction of the walkway (including descents) — approx. 641 m2,
7. Tree felling — approx. 41 pieces,
8. Implementation of the retaining wall — approx. 34 m,
9. Construction of the technology channel — approx. 1395 m,
10. Construction of lighting network, building of poles together with LED street lighting fixtures — 35 pcs ,
11. Reconstruction of the roadside ditch — approx. 271 mb,
12. Reconstruction of the fence — approx. 46.5 mb,
13. Execution of a project to temporarily change the organization of traffic, obtaining its approval, execution of horizontal and vertical marking, maintaining the marking for the duration of the works carried out together with the dismantling of the signage after completion of the task, 1 set. ,
14. Construction and construction of a memorial plaque, 2 pcs.
Repeated works - construction works: dismantling works, demolition works, preparatory works, felling of trees with grubbing, earthworks, underconstruction, execution of a trough with substrate preparation, asphalt works, production of roadway pavement made of asphaltobetone, works finishing, accompanying, surfacing, construction of vertical and horizontal marking, implementation of temporary traffic organization, adjustment of equipment, restoration and cleaning works, construction of rainwater drains with network armaments and canals, installation of wells and grooves, construction of the canal technological construction with armament, construction of curbs and edges, construction of walkway with asphaltobetone pavement, pedestrian and bicycle thrust with asphaltobetone pavement, paved roadsides, descents, construction of street lighting, reconstruction of the roadside ditch, reconstruction of the gas network. Value - 2930188.83 PLN.
Wadium - 180 000,00 PLN.
Pursuant to Article 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including those with disabilities and, taking into account these requirements, shall draw up a description of this subject of the order - full description includes SWZ.
The type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the contractor or subcontractor of persons performing activities during the execution of the order - full description includes SWZ.
Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. If materials, equipment, products or equivalent solutions are used, the Contractor is obliged to indicate them in the offer - full description shall include SWZ.
Road construction: Quiet - do construction work1. Cutting of trees with export and disposal — approx. 4 pcs. ,
2. Cutting of shrubs and trees with grubings — approx. 43 m2,
3. Earthworks — approx. 1151 m3,
4. Exchange of existing land — approx. 1086 m3,
5. Construction of a complete rainwater drainage network — approx. 294 m,
6. Construction of the technology channel — approx. 254 m,
7. Curb construction — approx. 664 m,
8. Buildings outskirts — approx. 408 m,
9. Construction of the substructure — approx. 2733 m2,
10. Production of pavement of mineral and bituminous mixtures, binding layer — approx. 2148 m2,
11. Manufacture of pavement of mineral and bituminous mixtures, abrasive layer — approx. 2148 m2,
12. Execution of sidewalk, armbands and descents and pedestrian crossings along with the substructure — approx. 450 m2,
13. Execution of the target vertical marking — 17,
14. Execution of the target horizontal marking — kpl.1,
15. Execution of the project to temporarily change the organization of traffic, obtaining its approval, execution of horizontal and vertical marking, maintaining the marking for the duration of the works carried out together with the dismantling of the signage after completion of the task, 1 set. ,
16. Construction of street lighting network including installation of street lighting type LED — 10 pcs. (network, pole and luminaire),
17. Reconstruction of the cable line SN — approx. 1362 m.
18. Construction and construction of a memorial plaque, 2 pcs.
Repeated works - construction works: dismantling works, demolition works, preparatory works, felling of trees with grubbing, earthworks, underconstruction, execution of a trough with substrate preparation, asphalt works, production of roadway pavement made of asphaltobetone, works finishing, accompanying, surfacing, vertical marking, implementation of temporary traffic organization, adjustment of equipment, restoration and cleaning works, construction of rainwater drains with network armaments and canals, installation of wells and grooves, construction of the canal technological construction together with armament, construction of curbs and edges, construction of pedestrian and bicycle thrust with asphaltobetone pavement, paved roadsides, descents, construction of street lighting, reconstruction of energy infrastructure. Value - 663900.04 PLN.
Wadium - 40 000,00 PLN.
Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including those with disabilities and, taking into account these requirements, shall draw up a description of the subject of the order - full description includes SWZ.
The type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the contractor or subcontractor of persons performing activities during the execution of the order - full description includes SWZ.
Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. Where materials, equipment, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer - a full description of SWZ.
Road construction: Darwin - do construction work1. Construction of a complete rainwater drainage network, approx. 410 mb,
2. Carriageway pavement with substructure — asphaltobetone pavement, binding layer approx. 2 537 m2,
3. Carriageway pavement with substructure — concrete cube pavement, abrasive layer approx. 2 537 m2,
4. Construction of walking - bicycle — approx. 1 353 m2
5. Construction of paved sides of concrete cube, approx. 451 m2,
6. Production of descents (asphaltobetone pavement and concrete cube) — approx. 234 m2,
7. Construction of the technology channel — approx. 240 m,
8. Built of poles with LED street lighting fixtures - 14 pcs (5 new poles, 9 existing poles, 14 new LED luminaires),
9. Execution of the project temporary change of the organization of the movement, obtaining its approval, execution
horizontal and vertical marking, maintaining the marking for the duration of the works carried out together with dismantling of the marking after completion of the task, 1 set. ,
10. Construction and construction of a memorial plaque, 2 pcs.
Repeated works - construction works: dismantling works, demolition works, preparatory works, earthworks, execution of substructure, execution of the trough with the preparation of the substrate, asphalt works, construction of roadway pavement made of concrete cube, finishing works, accompanying works, surface, construction of vertical marking, implementation of temporary traffic organization, adjustment of equipment with complement of hatches, boxes, recreation and cleanup works, construction of rainwater drains together with network armaments and canals, installation of wells and grooves, construction of the canal technological design together with armament, construction of curbs and edges, making a walking and bicycle thrust with asphaltobetone pavement, paved roadsides, descents, construction of street lighting. Value - 1121320.90 PLN.
Wadium - 70 000,00 PLN.
Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including disabled persons and, taking into account these requirements, draw up a description of the subject matter of the order - the full scope includes SWZ.
The type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the contractor or subcontractor of persons performing activities during the execution of the contract - the full scope includes SWZ.
Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - the full scope includes SWZ. If materials, equipment, products or equivalent solutions are used, the Contractor is obliged to indicate them in the offer - full description shall include SWZ.
Road construction: Bright - do construction work1. Grassing of greenery (bushes) — approx. 3 235 m2
2. Earthworks — approx. 2563 m2,
3. Construction of a complete rainwater drainage network — approx. 226 m,
4. Construction of the technology channel — approx. 282 m,
5. Curb construction — approx. 640 m,
6. Outskirts — approx. 620 m,
7. Construction of the substructure — approx. 4704 m2,
8. Production of pavement of mineral and bituminous mixtures, binding layer — approx. 1550 m2,
9. Manufacture of pavement of mineral and bituminous mixtures, abrasive layer — approx. 2500 m2
10. Execution of the sidewalk and descents with the substructure — approx. 654 m2,
11. Execution of a project to temporarily change the organization of traffic, obtaining its approval, execution of horizontal and vertical marking, maintaining the marking for the duration of the works carried out together with the dismantling of the signage after completion of the task, 1 set. ,
12. Construction of street lighting network including installation of street lighting type LED — 14 pcs. (network, pole and luminaire),
13. Orange Installation/Network reconstruction — approx. 1362 m.
14. Netia Installation/Network Reconstruction — approx. 1362 m.
15. Construction and construction of a memorial plaque, 2 pcs.
Repeated works - construction works: dismantling works, demolition works, preparatory works, felling of trees with grubbing, earthworks, underconstruction, execution of a trough with substrate preparation, asphalt works, production of roadway pavement made of asphaltobetone, works finishing, accompanying, surfacing, vertical marking, implementation of temporary traffic organization, adjustment of equipment, restoration and cleaning works, construction of rainwater drains with network armaments and canals, installation of wells and grooves, construction of the canal technological design together with armament, construction of curbs and edges, execution of walking and bicycle thrust, paved roadsides, descents, construction of street lighting - value 504035.67 PLN.
Wadium - 30 000,00 PLN.
Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including those with disabilities and, taking into account these requirements, shall draw up a description of the subject of the order - full description includes SWZ.
The type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the contractor or subcontractor of persons performing activities during the execution of the order - full description includes SWZ.
Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. Where materials, equipment, products or equivalent solutions are used, the Contractor is obliged to indicate them in the offer and submit them together with the offer - full description shall include SWZ.
Road construction: Kawalca - do construction work1. Construction of a complete rainwater drainage network, approx. 328 mb,
2. Carriageway pavement with substructure — asphaltobetone pavement, binding layer approx. 2 443 m2,
3. Carriageway pavement with substructure — SMA asphaltobetone pavement, abrasive layer approx. 2 443 m2,
4. Construction of pavements and paved sides of concrete cube, approx. 1,335 m2,
5. Execution of descents — approx. 470 m2,
6. Tree felling — approx. 26 pieces,
7. L-type retaining wall — approx. 56 m,
8. Construction of the technology channel — approx. 432 m,
9. Built of poles with LED street lighting fixtures — 12 pcs. ,
10. Execution of a project to temporarily change the organization of traffic, obtaining its approval, execution of horizontal and vertical marking, maintaining the marking for the duration of the works carried out together with dismantling the signage after completion of the task, 1 set. ,
11. Construction and construction of the memorial plaque, 2 pcs.
Repeated works - construction works: dismantling works, demolition works, preparatory works, felling of trees with grubbing, earthworks, underconstruction, execution of a trough with substrate preparation, asphalt works, production of roadway pavement made of asphaltobetone, works finishing, accompanying, surfacing, implementation of temporary traffic organization, adjustment of equipment, recreation and cleaning works, construction of rainwater drains together with network armaments and canals, installation of wells and grooves, construction of a technological channel with armaments, construction curbs and edges, the execution of the sidewalk, paved roadsides, descents, construction of street lighting. Value -1014514.08 PLN.
Wadium - 60 000,00 PLN.
Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including those with disabilities and, taking into account these requirements, shall draw up a description of the subject of the order - full description includes SWZ.
The type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the contractor or subcontractor of persons performing activities during the execution of the order - full description includes SWZ.
Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. If materials, equipment, products or equivalent solutions are used, the Contractor is obliged to indicate them in the offer - full description shall include SWZ.