Realisation measures + VerLEDding Overvoltages
The work consists of the following combinations:
• Replaced façade mounting tension wire system and power cable, remove old anchors
and repairing the façade in case of relocation of façade fastening. Replacement tension wire
and replace power cable and apply LED lighting
• Replace tension wire system and replace power cable and apply LED lighting
• Replace tension wire system while maintaining power cable and apply LED lighting.
• Replace power cable, apply LED lighting
• Apply LED lighting
Applying LED lighting in most cases means replacing an existing one
luminaire for a new luminaire with LED lighting. In addition, there are specials where a
retrofit solution is applied, for the time being:
1. There are about 500 BOL fixtures in the city that have a long remaining service life
have. These are equipped with a LED plate;
2. The Red Carpet contains special fixtures, these are provided with a retrofit solution;