The advertised measure is lot 29 metal construction and locksmith work for the construction project "New construction center Uncle Uhu" for about 400 children in Halle.
- 1 pc steel staircase 22 steps, 2-running with intermediate platform over 1 floor
- 20 m stair railing for v.g. stairs
- 21 m stair railing for on-site StB stairs
- 11.5 m platform railing for on-site StB stairs
- 15.5 m parapet railing on a gallery
- 4 window grilles
- 3 ceiling windows with walk-in panes
- Wooden handrails for v.g. stair railings