The subject of the Order is:
Task No. 1: Thermo-modernization of the building at 2 Niedziałkowskiego Street,
Task No. 2: Thermo-modernization of the building at 23 Niedziałkowskiego Street,
Task No. 3: Thermo-modernization of the building at 24 Niedziałkowskiego Street,
Task No. 4: Thermo-modernization of the building at 25 Niedziałkowskiego Street,
as part of the task "Thermo-modernization of residential buildings in the Municipality of Zawiercie – Niedziałkowskiego 2, Niedziałkowskiego 23, Niedziałkowskiego 24, Niedziałkowskiego 25", POIS.01.07.01-00-0045/20 under the POIS.01.07.01 sub-measure Supporting energy efficiency in residential buildings in the Silesian Voivodeship, POIS.01.07.00 activities – comprehensive elimination of low emissions in the Silesian Voivodeship priority axis POIS.01.00.00 – emission reduction economy of the Operational Programme Infrastructure and Environment 2014-2020.
Task No. 1: Thermo-modernization of the building at 2 Niedziałkowskiego Street (...)"Task No. 1: Thermomodernization of the building at 2 Niedziałkowskiego Street,
as part of the task "Thermo-modernization of residential buildings in the Municipality of Zawiercie – Niedziałkowskiego 2, Niedziałkowskiego 23, Niedziałkowskiego 24, Niedziałkowskiego 25", POIS.01.07.01-00-0045/20 under the POIS.01.07.01 sub-measure Supporting energy efficiency in residential buildings in the Silesian Voivodeship, POIS.01.07.00 activities – comprehensive elimination of low emissions in the Silesian Voivodeship priority axis POIS.01.00.00 – emission reduction economy of the Operational Programme Infrastructure and Environment 2014-2020.
1. The scope of works includes:
- necessary dismantling work,
- damp insulation of vertical foundation walls,
- injection of foundation walls,
- insulation of the ceiling,
- reinforcement of the roof truss
- reinforcement of the ceiling above the first floor,
- replacement of window joinery and external door joinery,
- replacement of window sills, flashings, replacement of gutters, drain pipes,
- renovation of chimneys,
- execution of chimney enclosures,
- dismantling and reassembly of information boards, flag brackets, lighting fixtures, antennas located on the facades, ordering the wiring,
- restoration of sidewalks/bands around buildings,
- insulation of external walls from the inside,
- insulation of the inner walls of the attic,
- replacement of roof covering,
- reinforcement of the ceiling under the first floor,
- execution of an internal gas installation,
- execution of electrical and lightning protection installation in accordance with the project,
- installation of protective earths and equalization connections in accordance with the project,
- installation of CO, DHW.
The Description of the Subject of the Order (OPZ) is Annex No 1A to SWZ.
2. The detailed scope of works is specified in the design documentation, technical specifications for the execution and acceptance of construction works and bills of quantities (as an auxiliary element to the calculation of the price) and technical expertise, which are annexes to the tender specifications (hereinafter referred to as swz).
3. The Contractor is obliged to provide a guarantee for the subject of the contract for not less than 3 years from the date of final acceptance of the works.
4. The warranty period for the subject of the contract is 5 years.
5. The tender drawn up must be in accordance with the subject-matter of the contract, the design documentation and the technical specifications for the execution and acceptance of the works.
6. Obligation to work under a contract of employment.
The Contracting Authority, acting under Article 95 (1) of the Public Procurement Law, requires that, as part of the implementation of the contract, the activities directly related to the subject of the contract (including the so-called direct costs resulting from the subject of works, i.e.: construction, construction, installation works, electrical, finishing) were carried out by persons employed on an employment contract within the meaning of Article 22 § 1 of the Act of 26.06.1974. The Labor Code (t.j. Journal of Laws of 2020 item 1320 as amended) regardless of whether such work will be performed by the Contractor, subcontractor or further subcontractor ( so-called manual workers). This requirement does not apply to persons: managers of construction, carrying out transport services, suppliers of building materials, equipment, equipment, equipment, natural persons engaged in economic activities, officiating members of the management or supervisory bodies of the Contractor, partners of a public company or to the extent that they will perform personally works for the benefit of the Ordering Party or the Contractor.
The requirements concerning how to document the employment of persons for the employment contract, the control powers of the Contracting Authority and the non-hiring of persons for the employment contract are set out in detail in the proposed contractual provisions which are Annex 3 to the SWZ.
7. In addition, the Contractor's obligations related to the performance of the contract are also specified in the draft provisions of the contract (PPU) attached to the SWZ.
8. The description of the subject of the contract does not require taking into account accessibility for persons with disabilities.
Task No. 2: Thermo-modernization of the building at 23 Niedziałkowskiego Street (...)Task No. 2: Thermo-modernization of the building at 23 Niedziałkowskiego Street,
as part of the croup. "Thermo-modernization of residential buildings in the Municipality of Zawiercie – Niedziałkowskiego 2, Niedziałkowskiego 23, Niedziałkowskiego 24, Niedziałkowskiego 25", NO. POIS.01.07.01-00-0045/20 under the poiS.01.07.01 sub-measure Supporting energy efficiency in residential buildings in the Silesian Voivodeship, poIS.01.07.00 activities – comprehensive elimination of low emissions in the Silesian Voivodeship priority axis POIS.01.00.00 – reduction of emissions of the programme's economy Operational Infrastructure and Environment 2014-2020.
1. The scope of works includes:
- necessary dismantling work,
- damp insulation of vertical foundation walls,
- injection of foundation walls,
- insulation of the ceiling,
- reinforcement of the roof truss
- reinforcement of the ceiling above the first floor,
- replacement of window joinery and external door joinery,
- replacement of window sills, flashings, replacement of gutters, drain pipes,
- renovation of chimneys,
- execution of chimney enclosures,
- dismantling and reassembly of information boards, flag brackets, lighting fixtures, antennas located on the facades, ordering the wiring,
- restoration of sidewalks/bands around buildings,
- insulation of external walls from the inside,
- insulation of the inner walls of the attic,
- façade of annexes,
- insulation of the ceiling,
- replacement of roof covering,
- reinforcement of the ceiling under the first floor,
- execution of an internal gas installation,
- execution of electrical and lightning protection installations in accordance with the project,
- installation of protective earths and equalization connections.
- installation of CO, DHW.
2. The Description of the Subject of the Order (OPZ) constitutes Appendix No. 1A to the SWZ.
3. The detailed scope of works is specified in the design dock, spec. Tech. execution and acceptance of construction works and bills of quantities of works (as an auxiliary element to the calculation of the price) and technical expertise, which are annexes to the SWZ.
4. The Contractor is obliged to provide a guarantee before. contracts for not less than 3 years from the date of final acceptance of works.
5. The warranty period for the subject of the order is 5 years.
6. The offer drawn up must be zg. with the subject of the order, dock. design and specification of the technical execution and acceptance of works.
7. Obligation to employ under a contract of employment.
The contracting authority, acting on the basis of Article 95(1) of the PPL Act, requires that as part of the performance of the contract, activities without. related to the subject of the contract (including the so-called direct costs resulting from the bill of quantities, i.e.: construction, construction, installation, electrical, finishing works) were wyk. by persons employed under an employment contract within the meaning of art. 22 § 1 of the Act of 26.06.1974 Labor Code (i.e. Journal of Laws of 2020, item 1320, as amended), regardless of whether these works will be performed by the Contractor, subcontractor or further subcontractor (so-called manual workers). This requirement does not apply to persons: managers of the building, wyk. tr. services, mat providers. construction, equipment, devices, natural persons conducting business activity, incumbent members of the management or supervisory bodies of the Contractor, partners of a general or partner company to the extent that they will personally perform works for Z.or W.
The requirements regarding the method of documenting the employment of persons under an employment contract, Z. control rights and sanctions for not employing people under an employment contract have been detailed. Round. in PPU.
8. In addition, the Contractor's obligations related to the performance of the contract are also specified in the Annex to the SWZ - (PPU).
9. The description of the subject of the order does not require taking into account accessibility for people with disabilities, there are no regulations in the scope of Article 100 paragraph 1 of the PPL Act.
10. The project is co-financed from Wed. of the European Union within the framework of the sub-subdivision. POIS.01.07.01 Supporting energy efficiency in residential buildings in the province of Śl., Dz. POIS.01.0700 – comprehensive elimination of low emissions in the province of śl.(...)
Task No. 3: Thermo-modernization of the building at 24 Niedziałkowskiego Street (...)Task No. 3: Thermo-modernization of the building at 24 Niedziałkowskiego Street,
as part of the task "Thermo-modernization of residential buildings in the Municipality of Zawiercie – Niedziałkowskiego 2, Niedziałkowskiego 23, Niedziałkowskiego 24, Niedziałkowskiego 25", NO. POIS.01.07.01-00-0045/20 under the poiS.01.07.01 sub-measure Supporting energy efficiency in residential buildings in the Silesian Voivodeship, POIS.01.07.00 activities – comprehensive elimination of low emissions in the Silesian Voivodeship priority axis POIS.01.00.00 – reduction of emissions of the economy of the Programme Operational Infrastructure and Environment 2014-2020.
1. The scope of works includes:
- necessary dismantling work,
- making moisture insulation of vertical walls of the fund.,
- injection of fund.
- insulation of the ceiling,
- reinforcement of the roof truss
- reinforcement of the ceiling above the first floor,
- replacement of window joinery and external door joinery,
- replacement of window sills, flashings, replacement of gutters, drain pipes,
- renovation of chimneys,
- execution of chimney enclosures,
- dismantling and reassembly of inf. boards, flag brackets, luminaires, antennas, located on facades, arrangement. Wiring
- restoration of sidewalks/bands around buildings,
- insulation of external walls from the inside,
- insulation of the inner walls of the attic,
- façade of annexes,
- replacement of roof covering,
- reinforcement of the ceiling under the first floor,
- execution of an internal gas installation,
- execution of chimney enclosures,
- execution of electrical and lightning protection installation zg. with the project,
- execution of instal.grounding ochr. and alignment joints,.
- execution of instal.CO, DHW.
2. The Description of the Subject of the Order (OPZ) is annexed. No. 1A to SWZ.
3. The detailed scope of works is specified in the dock. design, specification of technical execution and acceptance of construction works. and bills of quantities of works (as an auxiliary element to the calculation of the price) and technical expertise, which are in the state of the SWZ (hereinafter referred to as SWZ).
4. The Contractor is obliged to provide a guarantee for the subject of the contract for not less than 3 years from the date of final acceptance of the works.
5. The warranty period for the subject of the contract is 5 years.
6. The offer drawn up must be zg. with the subject of the order, the design dock and the technical specification of the execution and acceptance of works.
7. Obligation to poison. on a contract of employment.
The contracting authority, acting on the basis of Article 95(1) of the PPL Act, requires that as part of the performance of the contract, the activities of the public procurement law should be free of charge. Related to the subject of the contract (included in the so-called direct costs arising from the bill of quantities of works, i.e.: construction, construction, installation, electrical, finishing works) were performed by persons employed under an employment contract within the meaning of Article 22 § 1 of the Act of 26.06.1974 Labor Code (i.e. Journal of Laws of 2020, item 1320, as amended), regardless of whether these works will be performed by W., subcontractor or further subcontractor (so-called physical employees). This requirement does not apply to persons: hearts. bud., wyk.us transport services, suppliers of mat.bud., equipment, devices, persons fiz.conducting business activity of the company, incumbent members of the management or supervisory bodies of W., shareholders of the company j. or partner to the extent that they will wyk. personally works for Z. or W.
Requirements for the document method. employment of persons under a contract of employment, control rights of the Ordering Party and sanctions for the lack of employment of persons under an employment contract have been detailed. in PPU status. Incl. No. 3 to SWZ.
8. In addition, W.'s obligations related to the performance of the contract are also specified in the PPU attached to the SWZ.
9. The description of the subject of the contract does not require consideration. accessibility for people with disabilities, no regulations are introduced in the scope of Article 100(1) of the PPL Act.
10. Project dof. from Wed. The EU within subdivisions. POIS.01.07.01 Supporting energy efficiency in construction. housing in the Silesian Voivodeship, Dz. POIS.01.07.00 – comprehensive elimination of low emissions in the province of śl.o axis priorityt. POIS.01.00.00
Task No. 4: Thermo-modernization of the building at 25 Niedziałkowskiego Street (...)Task No. 4: Thermo-modernization of the building at 25 Niedziałkowskiego Street,
as part of the task "Thermo-modernization of residential buildings in the Municipality of Zawiercie – Niedziałkowskiego 2, Niedziałkowskiego 23, Niedziałkowskiego 24, Niedziałkowskiego 25", POIS.01.07.01-00-0045/20 under the POIS.01.07.01 sub-measure Supporting energy efficiency in residential buildings in the Silesian Voivodeship, POIS.01.07.00 activities – comprehensive elimination of low emissions in the Silesian Voivodeship priority axis POIS.01.00.00 – emission reduction economy of the Operational Programme Infrastructure and Environment 2014-2020.
1. The scope of works includes:
- necessary dismantling work,
- damp insulation of vertical foundation walls,
- injection of foundation walls,
- insulation of the ceiling,
- reinforcement of the roof truss
- reinforcement of the ceiling above the first floor,
- replacement of window joinery and external door joinery,
- replacement of window sills, flashings, replacement of gutters, drain pipes,
- renovation of chimneys,
- execution of chimney enclosures,
- dismantling and reassembly of information boards, flag brackets, lighting fixtures, antennas located on the facades, ordering the wiring,
- restoration of sidewalks/bands around buildings,
- insulation of external walls from the inside,
- insulation of the inner walls of the attic,
- façade of annexes,
- replacement of roof covering,
- execution of an internal gas installation,
- execution of electrical and lightning protection installation in accordance with the project,
- installation of protective earthing and equalization connections,
- installation of CO, DHW.
2. The Description of the Subject of the Order (OPZ) is Annex No. 1A to the SWZ.
3. The detailed scope of works is specified in the design documentation, spec. Tech. execution and acceptance of construction works and bills of quantities of works (as an auxiliary element to the calculation of the price) and technical expertise, which constitute annexes to the SWZ (hereinafter referred to as SWZ).
4. The Contractor is obliged to provide a guarantee for the subject of the contract for not less than 3 years from the date of final acceptance of the works.
5. The warranty period for the subject of the contract is 5 years.
6. The prepared offer must be in accordance with the subject of the contract, the design dock and the tech specification. execution and acceptance of works.
7. Obligation to employ under a contract of employment.
The contracting authority, acting on the basis of Article 95(1) of the PPL Act, requires that as part of the implementation. contracts for security activities. Related to the subject of the contract (included in the so-called direct costs resulting from the bill of quantities, i.e.: construction, installation, electrical, finishing works) were performed by persons employed under a contract of employment in roz.art. 22 § 1 of the Act of 26.06.1974 Labour Code (i.e. Journal of Laws of 2020, item 1320, as amended), regardless of whether these works will be performed by the Contractor, subcontractor or further subcontractor (so-called manual workers). This requirement does not apply to persons: construction managers, performing transport services, suppliers of construction mats, equipment, devices, fiz persons. lead. Department. Gosp., incumbent members of the management or supervisory bodies of the Contractor, partners of the partner company to the extent that they will personally perform works for Z. or W.
Requirements for the dock method Zatr. persons under a contract of employment, control rights of the Ordering Party and sanctions for the lack of zatr. persons under a contract of employment have been specified in detail in PPU- Annex No. 3 to SWZ.
8. In addition, the Contractor's obligations related to the implementation of the order. also attached to the SWZ - (PPU).
9. The description of the subject of the contract does not require consideration. accessibility for people with disabilities, no regulations are introduced in the scope of Article 100(1) of the PPL Act.
3. Project dof. from Wed. The EU under sub-sub- POIS.01.07.01 Supporting energy efficiency in construction. housing in the Silesian Voivodeship, Dz. POIS.01.07.00 – comprehensive elimination of low emissions in the province of śl.o axis priorityt. POIS.01.00.00.