The main railway projects include several minor power packages related to railway infrastructure.
The consultancy contract will include the design of several measures under several of these power packages, including
• Safety and environment - Dal PLO
• Goods by rail - Hauerseter timber terminal
• station development and hub - Jessheim crossing track and station measures
• double tracks Nordby-Jessheim
The measures are at different planning stages, and the work includes engineering design in the Technical detailed engineering design plan, zoning plan and construction plan, as well as possible assistance during construction. Please refer to A3 and D1 of the tender documentation for a detailed description of the scope of work.
The main railway projects include several minor power packages related to railway infrastructure.
The consultancy contract will include the design of several measures under several of these power packages, including
• Safety and environment - Dal PLO
• Goods by rail - Hauerseter timber terminal
• station development and hub - Jessheim crossing track and station measures
• double tracks Nordby-Jessheim
The measures are at different planning stages, and the work includes engineering design in the Technical detailed engineering design plan, zoning plan and construction plan, as well as possible assistance during construction. Please refer to A3 and D1 of the tender documentation for a detailed description of the scope of work.