Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 April 2019
Closing Date:
06 May 2019
Location(s):
PL922 Ciechanowski (PL Poland/POLSKA)
Description:

The subject of the contract is construction work entitled:

Construction of bicycle paths under the measure reducing air pollution and developing urban mobility:

Construction of the planned western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length 1802.81 m and

Construction of the inner beltway of the city center of Płońsk, km 0 + 000 - 0 + 650.72



The subject of the contract is construction work entitled:

Construction of bicycle paths under the measure reducing air pollution and developing urban mobility:

Construction of the planned western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length 1802.81 m and

Construction of the inner beltway of the city center of Płońsk, km 0 + 000 - 0 + 650.72.

The scope of the contract:

Construction of the planned western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length 1802.81 m.

The subject of the contract is Construction of the planned western beltway John Paul II in Płońsk from km 1 + 015 to km 2 + 817.81 length 1802.81 m; consists of demolition works, earthworks, execution of structural layers of the road surface, pavements, bicycle paths, construction of an engineering object (bridge) on the Płonka river, construction of collision-free intersections, storm water drainage, lighting as well as vertical and horizontal marking on the section of the investment task, execution of equipment technical and teletechnical infrastructure, greenery arrangement and land development within the designed beltway.

The task will start from the roundabout on ul. Płocka at 1 + 015 km, the end of the connection with the poviat road ul. Youth at 2 + 817.81; total length of the beltway 1,802.81 m.

The detailed scope of the subject of the order is attached as Annex 4 to the ToR: Detailed description of the subject of the contract.

Construction of the inner beltway of the city center of Płońsk, km 0 + 000 - 0 + 650.72.

The subject of the contract is the execution of construction works consisting in the construction of an internal beltway in the center of the city of Płońsk. The construction of the designed internal beltway consists of demolition works, earthworks, execution of structural layers of the road surface, pavements, bicycle paths, construction of a collision-free roundabout intersection at the intersection of Wolności and Grunwaldzka streets, rainwater drainage, lighting and vertical and horizontal marking, greenery and development area within the designed beltway.

The task starts near the intersection with Żołnierzy Wyklętych street (0 + 083.50 km), and ends at Grunwaldzka street in the area of the intersection with Wolności street (0 + 650.72 km). The total length of the beltway is 650.72 m, of which 567.22 m is to be built, according to the order specified.

The detailed scope of the subject of the order is attached as Annex 4 to the ToR: Detailed description of the subject of the contract.

Download full details as .pdf
The Buyer:
Gmina Miasto Płońsk reprezentowana przez Burmistrza Miasta Płońsk
CPV Code(s):
45000000 - Construction work
45100000 - Site preparation work
45111300 - Dismantling works
45220000 - Engineering works and construction works
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork