Particle accelerators | Tenderlake

Particle accelerators

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
31 July 2023
Closing Date:
28 August 2023
Location(s):
DE711 Darmstadt, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
FAIR GHe Warm Gas Storage Tanks (12 units)

For the FAIR project, 12 x 100 m^3 helium gas storage tanks are required for FAIR's Super-FRS isotope separator. The helium is stored there at ambient temperature, at a pressure of up to 25 bar, and is taken from the refrigeration plant for liquefaction, or is also returned when components are warmed up. The tanks are required for commissioning of the SuperFRS. The tanks shall have a diameter of 2.8 m and a height of about 18 m. They will be installed upright. The tender covers production, transport and installation (erection + anchoring + handover).

12 x 100 m^3 helium gas storage tanks

Download full details as .pdf
The Buyer:
FAIR - Facility for Antiproton and Ion Research in Europe GmbH
CPV Code(s):
31643000 - Particle accelerators