Construction of a new frame bridge in the course of the K 27 VG over the future Wolgast bypass. For the new construction of the bridge, a bypass route is to be built on the eastern side next to the future embankments while maintaining traffic on the K 27 VG. In the area of the structure, the ability to drive under it for the construction of the line (separate lot) must be taken into account. The bypass is to be completely dismantled. The dam construction material for the K 27 is to be loosened, transported, improved and installed on the mainland.
Construction of a new frame bridge in the course of the K 27 VG over the future Wolgast bypass. For the new construction of the bridge, a bypass route is to be built on the eastern side next to the future embankments while maintaining traffic on the K 27 VG. In the area of the structure, the ability to drive under it for the construction of the line (separate lot) must be taken into account. The bypass is to be completely dismantled. The dam construction material for the K 27 is to be loosened, transported, improved and installed on the mainland.