The Limmattalbahn, as a fast distributor on the 13.4 km long route Altstetten as well as the communities Schlieren, Urdorf, Dietikon, Spreitenbach and Killwangen, will be optimally developed and connected. It will be built in two stages. In the present submission process, the entrepreneur steel construction / building shell is determined for the intended depot of the Limmattalbahn.
The subject of the submission is in particular the steel assembly, the facade construction, the glazing, the sun protection, the scaffolding and the roofing work for the depot.
The Limmattalbahn, as a fast distributor on the 13.4 km long route Altstetten as well as the communities Schlieren, Urdorf, Dietikon, Spreitenbach and Killwangen, will be optimally developed and connected. It will be built in two stages. In the present submission process, the entrepreneur steel construction / building shell is determined for the intended depot of the Limmattalbahn.
The subject of the submission is in particular the steel assembly, the facade construction, the glazing, the sun protection, the scaffolding and the roofing work for the depot.