Upgrades to the electrical and technical control installations, site and construction engineering, as well as traffic management in Håklepp tunnel.
Electro/SRO:
— 1 new technical building (South),
— renovation of an existing technical building (North),
— 2 new emergency station kiosks in the open air,
— 4 new emergency stations in the tunnel, with new sub-distributions, as well as drawing cupboards,
— 2 new barriers,
— 4 new variable signs (RBG),
— 610 m continuous emergency lighting,
— 7 new street light points for the transition zone to unlit road,
— 610 m radiation cable,
— approx. 16 000 m electricity cables,
— approx. 2 500 m fiber cables,
— approx. 180 lighting fixtures,
— approx. 14 000 meter conduits,
— approx. 700 meter cable ladders,
— complete earthing installations.
Site and construction engineering:
— 110 m
— 6 000 m
— 1 060 m
— 2 910 m
— 7460 m
— 160 m
— 638 m railings, concrete,
— 280 m railings, steel,
— 640 m ditches for surface water and surface water pipeline,
— 16 manholes for surface water,
— 1 oil separator.