The housing association Ingelheim am Rhein GmbH is planning a new residential building, Kirchstraße 4-8, Ingelheim am Rhein. The building plot is located in the mature centre of Frei-Weinheim, a few metres from the Rhine dam and accessible from Kirchstraße with the St. Michael Church from the east and from Schubertstraße with the Gustav Adolf Church from the south. The construction project includes the construction of 10 houses with 83 apartments and a living space of approximately 5,892 m². The converted space is 38,531.84 m³ including the basement (BRI (R)), the gross floor area (GFA (R)), including the basement, is 11,311.16 m². A large part of the building site is to be subjected to an underground car park. 5 of the basement buildings have to be connected to the underground car park by means of locks. 5 buildings are located outside the underground car park and do not have a basement.
The subject of this call for tenders is the metal construction and locksmith work necessary for the construction project.
Extent of the work:
- 10 post/transom façades, each approx. 2.30/3.00 m, with front door and letterbox system
- 226 pieces metal sliding shutters
- 6 pieces all-glass canopies for house entrances
- 29 steel doors and fire doors
- approx. 560 lm steel railing indoors and outdoors
The housing association Ingelheim am Rhein GmbH is planning a new residential building, Kirchstraße 4-8, Ingelheim am Rhein. The building plot is located in the mature centre of Frei-Weinheim, a few metres from the Rhine dam and accessible from Kirchstraße with the St. Michael Church from the east and from Schubertstraße with the Gustav Adolf Church from the south. The construction project includes the construction of 10 houses with 83 apartments and a living space of approximately 5,892 m². The converted space is 38,531.84 m³ including the basement (BRI (R)), the gross floor area (GFA (R)), including the basement, is 11,311.16 m². A large part of the building site is to be subjected to an underground car park. 5 of the basement buildings have to be connected to the underground car park by means of locks. 5 buildings are located outside the underground car park and do not have a basement.
The subject of this call for tenders is the metal construction and locksmith work necessary for the construction project.
Extent of the work:
- 10 post/transom façades, each approx. 2.30/3.00 m, with front door and letterbox system
- 226 pieces metal sliding shutters
- 6 pieces all-glass canopies for house entrances
- 29 steel doors and fire doors
- approx. 560 lm steel railing indoors and outdoors