Conversion of the building in 2001 in the old barracks into an 11-group daycare center
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
This is Lot 14 - Sanitary Work with the following main dimensions:
- 1 st fresh water station kitchen area
- 1 pc. house connection group
- 1 pc. grease trap with lifting system
- approx. 90 pcs valves and installation parts
- 12 pcs. play and wash area
- approx. 620 sanitary objects, furnishings, fittings, hot water devices,
- 2 pcs. barrier-free toilet and washbasin facilities, electrically height-adjustable,
- approx. 1,200 m wastewater pipe DN 40 - 110 including moulding mile
- approx. 350 m sewage pipe DN 50 -125 including fittings, grease wastewater area kitchen,
- approx. 650 m drinking water pipe 12 - 42 mm stainless steel incl. fittings
- approx. 1,800 m multi-layer composite pipe 16 - 32 mm plastic including molded parts,
- approx. 450 core holes diameter 20 - 250 mm