VE 18 Metal construction work Interior doors - steel glass
General works
Work and assembly planning,
75 m separating cut and removal of interior plaster in the connection area
75 m Ausgleichsputz, Glattstrich
75 m substrate consolidation, primer
25 m threshold substructure as an early performance
Interior doors - steel glass
3 pcs steel glass element F30 2.73 x 2.80 m - with T30 RS door 2 flg. (fh, rds) with SL
double-sided and top panel
2 pcs steel glass door 2 flg. asymmetrical. T0; 2.11 x 2.20 m, D E.052; T1.052
1 pc steel glass door 2 flg. asymmetrical. T0; 1.95 x 2.20 m; D 2.052
1 St Stahl Glas Element T90 (fb, dss) 1 flg. 1.51 x 2.135, D 1.051
1 St Stahl Glas Element T30 RS (fh, rds) 1 flg. 1,51 x 2,135 m, T2.053.1
2 St Stahl Glas Element T30 RS (fh, rds) 1 flg. 1,49 x 2,135 m, T E.053; T 1.053
equipment
3 pcs swing door drive with integrated smoke detector for 2-flg. Fire and smoke protection door
2 pcs revolving door integrated. Smoke detector, 1 flg. Fire and RS door, door width up to 1500 mm
Working on existing interior doors
2 pcs assembly and alignment of existing doors (metal, glass), 2 flg. up to 1.50 x 2.01 m
2 pcs FS object fitting as handle set