The ASKLEPIOS Klinik Nord - Heidberg intends to carry out a restructuring in building 3. For this purpose, new bed rooms are created on the ground floor to floor 2. A central changing room is built in the basement. Fire protection work is carried out in OG3.
Quantity unit power:
- 2,400 m copper pipe distribution network;
- 6 pieces area control units compressed air / oxygen;
- 50 ball valves;
- 200 gas sampling points compressed air / oxygen;
- 200 pieces RS couplings oxygen / compressed air for on-site MVEs;
- 200 core drillings with fire protection bushings.