The MuK has been renovated in several construction phases since 2016.
As part of this construction phase, the so-called kitchen cube is now back to the shell and rebuilt again. The kitchen cube includes the MuK's large kitchen as well as the bistro area, storage rooms and changing rooms.
- 130 m
- 675 m
- 1,300 m wall connection as an open shadow gap,
- 115 m
- 135 m
- 120 m