The community of Feldkirchen intends to build a residential complex with lunchtime care, multifunctional room, 2 clusters of senior citizens' homes and an underground car park.
The planning site is located in a residential area that is adjacent to the special use in the east.
In the north, the railway line represents a border with the adjoining industrial park.
The proposed structures encompass a shared courtyard in a relaxed position, which forms the center of the quarter.
The publication includes the performance Technical Insulation.
execution deadlines;
insulation;
Start of output (W+M planning, ordering, production,..): 6.12.2021
Start of work on the construction site: 10.1.2022
Completion including all construction work: 9.9.2022
Core quantities:
— 218 m
— 31 m
— 302 m
— 2 094 m rubber cold water insulation, without sheath, DN 12-DN 50;
— 910 m cold water insulation of rubber, with PVC jacket, DN 12-DN50;
— 373 m cold water insulation in pretext DN 12-DN 20;
— 195 m hot water insulation in pretext DN 12-DN 20;
— 497 m cold water insulation in TG of rubber, with sheath, DN 12-DN 50;
— 900 m insulation hose for dirty water DN 56-DN 90;
— 733 m rubber rainwater insulation, without jacket, DN 70-DN 200;
— 73 m rubber rainwater insulation, with PVC jacket, DN 70-DN 200;
— 1 432 m thermal insulation made of mineral fibre, without sheath, DN 15-DN 65;
— 2 447 m thermal insulation made of mineral fibre, with PVC jacket, DN 12-DN 65;
— 264 m thermal insulation made of mineral fibre, with sheath sheet metal, DN 12-DN 65;
— 490 m thermal insulation in TG made of mineral fibre, with PVC jacket, DN 12-DN 65;