2023-6615-00021_Stadtbahn 2020 TA 1.2 - Nossener Brücke/Nürnberger Straß e_Los 3.4 Clearance of the ZBH construction site and Fabrikstraße, including the construction of temporary roadway between Fabrikstraße and Oederaner Straße
Traffic safety with 310 m construction fence and 100 m vegetation protection fence as well as 200 m barrier; Modification of lighting installations including installation services; 1500 m3 of excavation for civil engineering services; dispose of 350 m3 of soil; supply and install 280 m3 of soil; Make 125 m2 of concrete pavement; Laying 700 m of cable conduit; 75 m of services for the conversion of district heating connections; 110 m conversion of district heating connection in the building; 220 m Manufacture 110 KV pipeline civil engineering and conduit laying; 75 m of gas pipeline PE DN 200; 500 m relining drinking water pipes d110; 75 m pipe tree drinking water pipe in open trench d 110; Install 1 piece of bulk water meter shaft; 82 m house connection pipes drinking water; make approx. 2300 m2 of asphalt roadway; 450 m2 of pavement restoration in asphalt; make curbs about 200 m; Removing and reinstalling road drainage systems drains approx. 5 pieces and 20 m pipe; 350 m of marking work; install 80 m of concrete thresholds; Build a 60 m concrete barrier