Construction of a temporary bridge over the Lenne in Werdohl.
The advertised services include:
- The construction of a temporary bridge (SS 80) over the Lenne,
- The creation of a construction-time bypass for traffic and pedestrians,
- The construction of a retaining wall for the slope-side footpath towards Ütterlingsen.
The work advertised in part A contains the following main services:
approx. 5 780 m
approx. 550 m
drive approx. 3 400 tons of contaminated soils DK II,
Lay approx. 30 m of pipeline DN 315,
approx. 1,065 m
approx. 4 780 m
approx. 1 250 m
approx. 1 250 m
approx. 1 250 m
approx. 1 250 m
approx. 480 to steel construction bridge assembly,
7.5 tons of steel construction supply and manufacture auxiliary pillars.