Disposal services for hazardous and non-hazardous types of waste from contaminated areas.
- disposal of hazardous waste types;
- Disposal of non-hazardous types of waste;
—— Recycling of pollutant-free cables approx. 0.35 t;
—— disposal of metal waste containing harmful substances approx. 25.22 t;
- Disposal of sludge approx. 65.00 t;
—— suction phase approx. 200.00 t;
—— Disposal contam. Water approx. 150.00 t;
—— Disposal of hazardous building site waste approx. 22.20 t;
—— recycling of mixed scrap approx. 16.00 t;
—— Disposal of KMF-containing insulation material approx. 4.80 t;
—— Disposal of contaminated waste wood approx. 1.00 t;
—— disposal of compostable waste approx. 18.00 t;
—— Disposal of hazardous substances. Plastics approx. 190.00 t;
—— Disposal of building rubble> W 2 or> Z 2 approx. 7 400.00 t;
—— Disposal of building rubble W 2 or Z 2 approx. 1,500 t;
—— Disposal of contaminated foils approx. 5.00 t;
—— Disposal of RC material> W 2 approx. 4,300.00 t;
—— Disposal of RC material W 1.2 approx. 12,936.00 t;
—— Disposal of RC material W 2 approx. 1 300.00 t;
—— Disposal of building rubble-coal mixtures approx. 200.00 t;
—— Disposal of building rubble> W 2 approx. 200.00 t;
- Provision and delivery of the required vehicles or transport containers such as containers or big bags upon request within one week or within 24 hours for fluids and sludge from pipelines;
- Setting down of containers and other receptacles according to the local allocation by the contractor of the measure VTRA and floor replacement (VTRA = vacuum thermal cleaning system)
- Collection of the loaded containers or other transport containers within 3 working days after request by the contractor of the measure VTRA and soil exchange or within 24 hours in the case of fluids and sludge from pipelines;
- Elaboration of all necessary documents to be provided by the contractor to external waste disposal for the correct management of waste legislation;
- The VTRA warehouse is a special case here. The oversized grains and contaminants screened from the soil to be treated before the vacuum thermal treatment are transferred to the containers provided by the contractor for external disposal and collected there until the containers are filled and can be disposed of . This can result in very long container parking times. The contractor for the VTRA and soil exchange measure is also obliged to provide stand space for the containers within or directly next to the warehouse and to ensure accessibility for the transport of the containers to and from the warehouse.