Lot 8a Natural façade
Preparation:
- 1 psch factory and assembly planning
- 1 psch Static verifications, installation plans insulation
Scaffolding/ Scaffolding anchors:
- 30 pcs permanent scaffolding anchors
- 30 pcs thermal break
- 1 psch static detection
Substructure:
- 395 sqm substructure thermal break
- 395 sqm supporting structure wickerwork
- 125 m Laibungsrahmen, Abschlussprofile
Thermal insulation:
- 395 sqm façade thermal insulation WLG 035, 200 mm
- 395 sqm façade membrane
- 155 m Fassadenbahn, Laibungs- Anschlussbereiche
Facade cladding:
- 395 sqm wicker façade willow rods
- 20 sqm façade panels
Plumbing work:
- 22 m window sills, aluminium
- 115 m window and door reveals gek. Sheet metal