Conversion and renovation of the all-day school Gießen West
Demolition and disposal of pollutants.
Rolling scaffolding 4 pieces, dismantling of fixtures 21 pcs, panels 3 540 m2, pipelines 500 m, lightweight walls 350 m, walls2 100 m 2, floor structure 3 700 m2, creation of locks 2 pcs, stop mastics 250 m and facade cladding, as well as the dismantling of roofing 85 m2 .