New construction of an 8-group daycare center as a replacement building for the Blandine-Merten-Haus daycare center, which was destroyed in the Ahr flood in 2021.
- 2-storey building in solid construction with ETICS, partly wooden façade
- Building plot approx. 4,465 m².
- Net room area of around 1,925 m².
- Daycare places Space for 25 U3 children and 150 U3 children.
- Flood-adapted construction method in the flood plain
- District heating and PV
- Central ventilation system
LOT 6 Electrical, during shell construction
- Assembly of concrete components during the shell construction phase
- ca. 50 Installationsdosen
- approx. 150 m Leerrohr