At the Schwarze Pumpe industrial site, the existing road network is to be prepared for the future infrastructure development of the site.
In preparation for the creation of the conditions for the development of new settlement areas on old industrial areas, there is a need to rebuild or modernize subsequent road sections.
3.1 New construction of road H-South between roads 7 and 10
3.2 Fundamental expansion and needs-based adaptation of road I between the national border and road 10
3.3 Road 4 between roads H and F and modernisation of Road F between Str.4 and LG
3.4 Road 5 between roads H and F
3.5 Extension and widening of road 7 between road H and road F
3.6 Extension and widening of road H between roads 4 and 7
In summary, the following are to be planned:
- 700m new building,
- 3700m fundamental modernization and
- 400m Asphaltdeckenmodernisierung.
These are planning services in work phases 3 to 9 for the service profiles §43 HOAI Ingenieurbauwerke;
§47 HOAI traffic facilities; §55 HOAI To offer technical equipment.
All service phases for the individual sub-objects are commissioned individually and gradually.