Construction of a crèche and basic school in Wasserbillig
Plaster work (1,700 m 2 ), light partitions (1,400 m) 2 ), false ceilings (1,500 m) 2 ), paintings (8000 m) 2 ) and soft floor coverings (1,600 m 2 ).
Plaster work (1,700 m 2 ), light partitions (1,400 m) 2 ), false ceilings (1,500 m) 2 ), paintings (8000 m) 2 ) and soft floor coverings (1,600 m 2 ).