See II.2.4).
This assignment concerns the delivery, assembly, inspection, rental, dismantling and removal of racks on sites one and two of Belgoprocess. These statements can be placed:
- outdoors in the open air,
- inside conventional buildings,
- inside or outside, in the controlled areas (including the cells) of Belgoprocess.
If the scaffolding cannot be released, the contractor must indicate the residual value so that it can be bought off if necessary.